Saturday, March 30, 2013

Malaysian Aerospace Centre Since 1993

The talks by politician on the topic of building Malaysian Aerospace centre with acceptable level of credibility has been going on for more than 20 years.

In 1993, the PM then, made an ambitious plan to put Malaysia into Aerospace Manufacturing map, and three projects were launched..

- The Eagle Aircraft Project by Eagle Aircraft (Malaysia) Sdn Berhad. Many are wondering what happen this project. I know a few Eagles were on sale for RM50,000 to training organisations.
-   The second project was the German-designed Dornier Seastar CD2,  a twin engine forteen seater amphibious aircraft scheduled to be manufactured in 1993.
- The third is the  Swiss-designed Datwyler MD3-160. The two-seater aerobatic trainer aircraft by SME Aerospace.

Looking to the south, the neighboring Singapore had made a giant lap, It may be a good idea for the the Minister Mukhriz to

The extract of the speech is given below...


Oleh/By  : DATO' SERI DR. MAHATHIR BIN MOHAMAD 
Tempat/Venue  :  LANGKAWI, KEDAH 
Tarikh/Date  :  07/12/93 
Tajuk/Title   :  THE OPENING OF THE LANGKAWI  
   INTERNATIONAL MARITIME AND 
   AEROSPACE EXHIBITION 1993 


 
    On behalf of all Malaysians, I  wish  everyone  a  warm
'Selamat  Datang'  to  the Islands of Langkawi, the isles of
many  legends,  and,  in   particular,   to   the   Langkawi
International  Maritime  and  Aerospace  Exhibition  (LIMA),
1993.   I hope you managed to get  a  glimpse  of  our  rich
cultural   heritage  in  the  welcoming  ceremony  you  just
witnessed.  For  those  who  were  here  for  the  inaugural
exhibition  of LIMA '91, I am sure you will have noticed the
many infrastructural changes which have been made.  This  is
to ensure that your stay here will be more comfortable.
2.      Langkawi  is  centrally  located  within  the growth
triangle  recently  formed  by  the  northern   states   and
provinces  of    Malaysia  and  Indonesia, with the southern
provinces of Thailand.  With this growth  triangle  concept,
it  is anticipated that the region will gain importance, not
only as an attractive tourist destination,  but  also  as  a
vital   investment   location.      An  international  level
exhibition such as  LIMA  is  both  apt  and  timely.    The
Government  hopes  that  more  international  events will be
staged  here   in   Langkawi,   especially   at   this   new
International   Exhibition   and  Convention  Centre.
3.    Although most of the world saw recessionary trends  in
the  last  few   years,    the   economies   of  East  Asian
nations -- particularly those in Southeast Asia  -- continue
to  show dynamic  growth.   Malaysia is at the heart of this
growing region and has developed a strong manufacturing base
during the last five years.  The Malaysian economy has moved
away  from  its traditional reliance on the  export  of  raw
materials to the export of  manufactured  goods.    Malaysia
is also  moving  away  from  labour - intensive  to  capital         and
technology-intensive industries.
4.   With this solid 'hi-tech' and  engineering  background,
Malaysia is proud to step into the aerospace industry.  When
LIMA  '91  was  held  it  stimulated  a  lot of interest and
awareness among Malaysians and foreign industrialists of the
potential that exists in the aerospace industry,  especially
in  the  Asia  Pacific region.   This industry is associated
with high technology which we  are  anxious  to  acquire  in
order to bring the nation to a higher level of technological
advancement and international competitiveness.
5.      This  time,  two  years  after LIMA '91, a Malaysian
company,  Composite  Technology  Research  Malaysia  (CTRM),
announced  its  participation in the production of the Eagle
X-TS, a light all- composite aircraft, in  partnership  with
an  Australian  company.    As of May 28 this year, Malaysia
took over the whole company.  The first production model  of
the  Eagle  rolled  out  of the Australian facility in Perth
last October.  Today, it is being displayed  for  the  first
time  in Malaysia.  Plans are now in hand to manufacture the
aircraft entirely in Malaysia.  The Eagle project is one  of
the  bold  steps  that  we  are  taking  into  the  world of
composite technology.  Eagle Aircraft (Malaysia) Sdn  Berhad
has also secured firm orders for six aircraft from its first
customer,  the Conservation and Land Management Authority of
Western Australia.  The Eagle is suited for  leisure  flying
and for surveillance work.
6.    This year,   Malaysia became  involved  in  two  other
aircraft manufacturing  projects.  I am pleased to  announce
that   the   German-designed   Dornier   Seastar   CD2,    a
twin-engined   fourteen-seater,    amphibious   aircraft  is
scheduled for manufacture in Penang  next  year.   Aerospace
Industries   Malaysia  (AIM)  is  leading  a  consortium  of
companies to produce the Seastar entirely in Malaysia.  This
aircraft  has enormous scope for sales in the   Asia-Pacific
region, being useful both for maritime patrols,  search  and
rescue missions, as well as for lake and island resorts.
7.   A third project is the production of the Swiss-designed
Datwyler MD3-160 two-seater aerobatic trainer aircraft.  SME
Aerospace will be producing these low-cost trainers, and  we
expect  to  see  the  first  Malaysian-produced  MD3s flying
before the end of next year.   There is a  demand  for  this
category  of  aircraft world-wide and SME Aerospace hopes to
secure a market niche.
8.   In manufacturing these three aircraft, we have embarked
on new areas  of  technology  with  very  stringent  quality
requirements.    The  demands of the aerospace industry also
require that the Malaysian workforce be extremely  conscious
of  quality  in the whole production process.  We believe we
have the necessary work ethics and skills for this  kind  of
industry.
9.     These are undoubtedly small beginnings.  But then the
U.S.  entered the aerospace industry with the Kitty Hawk, an
aircraft that is even more primitive than the three aircraft
I have mentioned.   In a century's  time  we  may  have  our
Boeing  and McDonnell Douglas counterpart, God willing.  But
a beginning has to be made.  And three small aircraft make a
good beginning, modest though they may be.
10.    In conjunction with its efforts to  promote composite
product  manufacturing  in  Malaysia,   the  Government  has
approved a Composite  Manufacturing  Zone  (CMZ) in Malacca.
The CMZ,  among other things, will house:
      -  an aerospace industries centre, with Eagle Aircraft
         Malaysia taking the lead;
      -  a non-aerospace products manufacturing centre, with
         Talon  Malaysia  as  a   key  tenant  manufacturing
         hockey sticks from composite materials; and
      -  an advanced composites laboratory to provide
         research backup for companies located in the CMZ.
11.    We  look forward to having more companies, both local
and foreign, joining us at the CMZ.  Composites, as you  are
well  aware,  could  be  used  in  the  manufacture  of many
sporting items, marine  vessels,  fittings  for  trains  and
vehicles  and  all containers where payload and strength are
major considerations.   Of course more  and  more  composite
materials  are  being  used  in both commercial and military
aircraft.   Up till now a  great  deal  of  manual  work  is
required.    And Malaysia's low-cost highly- skilled workers
are a great asset in manufacturing with composites.
12.    Malaysia  is  also  developing   its   own   maritime
industries.    We  have  already  built freighters and ferry
boats.  The naval dockyard at Lumut, which was  corporatised
two  years  ago, will be a new entrant into the shipbuilding
industry.  It will be involved in the construction of patrol
vessels for the Royal Malaysian Navy in  collaboration  with
foreign  shipbuilding companies.   Local industries involved
in the manufacture and supply  of  shipboard  equipment  and
systems  will  be  able  to participate and benefit from the
transfer of its technology.  The Ministry  of  International
Trade  and  Industry  will  spearhead  a  vendor development
programme for small and medium scale industries  to  support
the  patrol  vessel project, just as it did for the national
car project.
13.   There is  also  a  great  deal  of  potential  in  the
construction of pleasure craft.  During LIMA '91, almost all
the  pleasure  boats  exhibited  were sold by the end of the
exhibition.   The growing  affluence  of  Malaysia  and  its
neighbours  will undoubtedly create a demand for such craft.
I would like to urge local and foreign entrepreneurs to look
into the possibility of developing Malaysia as the  regional
centre  for  the  production of such craft.   With more such
craft in local waters there will  be  increasing  needs  for
marinas and boat maintenance facilities.  Quite a number are
being built now, but I believe more will be needed soon.
14.    In order to meet the demands of industrialisation and
new technologies, changes will  be  made  to  the  education
policy  and  new courses will be offered by the institutions
of higher learning, government and private sectors.
15.   The government spares no effort  to  provide  all  the
necessary  support  facilities to the private sector keen to
invest in high technology ventures.  The hi-tech park  being
developed  in  Kulim,  Kedah and the CMZ in Malacca are just
two examples of this effort.   The Malaysian  Government  as
you can see responds quickly to the needs of investors.
16.   I would like to point out once again that the Langkawi
International Maritime and Aerospace Exhibition is not  just
another  aerospace or maritime show.  It is true that almost
every country in Asia now holds such exhibitions.  But  LIMA
is still relevant and special because it is held in a region
with the fastest growing economy.  People in this region are
now  more affluent and are  not  only  travelling  more  but
are  actually beginning to regard ownership of private jets
and luxury boats as essential for business and for pleasure.
17.   At LIMA, exhibitors will  have  the  maximum  time  to
display  and  demonstrate the capabilities of their products
to the people who matter.    The  site  of  this  exhibition
permits  full  aerobatics  as  we  are  not  hampered by the
operational  needs  of  a  busy   commercial   airport,   by
densely-populated population centres or by crowded harbours.
18.    LIMA  '93  is more than twice as big as LIMA '91, the
first aerospace and maritime exhibition in Langkawi.    This
in itself is evidence of its recognition and relevance.  But
in  addition,  the seminars on aviation held in conjunction,
is topical and relevant to the expanding air travel industry
in the region and the world.
19.  Besides, Langkawi is a wonderful place  for  both  work
and  play.    Less  than  10 years ago there were only about
30,000 visitors to these islands.   Last year  more  than  a
million  visitors  came,  some  30 percent of whom were from
outside Malaysia.  So your business visit in 1993 should  be
followed  by  vacations on these islands in the future.  You
will find that LIMA has introduced you to more than just  an
aerospace or maritime show.
20.  The series of LIMA exhibitions that we plan to stage is
also  aimed  at  challenging  Malaysians  to  respond and be
pro-active to the  demands  of  a  technology-driven  world.
Malaysia  cannot afford to be left behind.  In a competitive
world  there  can  be  no  complacency.    Alertness  and  a
willingness to venture into new fields are the prerequisites
of merely staying abreast.
21.      I would like to thank all exhibitors and guests who
have come from far and near to  support  LIMA  '93.    I  am
confident  that  the business contacts they will make in the
course of their participation  in  LIMA  '93  will  be  most
worthwhile.
22.    It  now  gives  me great pleasure to declare LIMA '93
open.

Wednesday, March 13, 2013

Petronas Project US$2bil

Petronas, the biggest Malaysian Company is about to award a large company under the EPCC concept (engineering, procurement, construction, commission) to a Japanese company. The project is for LNG train at the Complex at Bentulu. Sarawak.It is unknown who the local partner is, and it is hoped that the partner is a company involved with similar activities.

According to Upstream report, the Japanese company was responsible for eight trains earlier trains.

In Feb 2013, Petronas awarded Front End Engineering Design project to JGC corporation and Chiyoda Corp.

Search in google shows JGC to be....JGC (Malaysia) Sdn Bhd is a company dealing with oil & gas engineering & construction. It was establised in 1984. It's headoffice JGC Corporation is based in Yokohama, Japan.







Monday, January 14, 2013

EPF project Battersea Power Station

EPF and Sime Darby is launching the controversial UK project to build the Battersea Power Station.

TheStar 10 Jan 2013
The Malaysian consortium is made up of EPF, SP Setia, Sime Darby tendered and was awarded the contract with the projected value of RM40bil.

The contract include the building of the residential units. The first phase comprises of 800 mixed units of one, two and three bedrooms apartment.

Tuesday, December 4, 2012

RMAF new Helicopter - 12 EC725

Recently, Malaysian RMAF had received 2 of the twelve ordered EC725 helicopter manufactured by French Eurocopter group.



The Brazilian Bought the Helicopter costing RM 84 mil per unit compared to Malaysian buying at RM193 million per unit, as quoted in the star on 4 Dec 2012.It does appear that the Brazil has a better deal as the helicopters will be assembled in the country (http://events.eurocopter.com/en/article/helibras-inaugurates-major-new-brazilian-assembly-facility-ec725ec225-helicopters-itajuba)

It was reported that Thai is buying four of the kind...Chiangrai Times– The Government of Thailand has reportedly ordered four EC725 helicopters for Search and Rescue (SAR) missions. The €100 million deal was announced by Thai deputy prime minister Yutthasak Sasiprapa on 29 August, quoted by the French media.

The value of 100 million Euro is about RM397.258 million. That mean per helicopter is RM 99.3 million, about half of the Malaysian

Quoted Costs

1. Wiki --- USD25 millions--- RM75 million
2. 




Monday, November 26, 2012

26Bil. For 20 new Projects

The Prime Minister of Malaysia had made the announcement about the 20 projects at the total cost of RM26bil. However the details of timeline, the individual project cost and the exact location was not announced.

The breakdown of the projects are given in the news...

a. 11 under ETP under 7 areas...
     - oil, gas and energy.
     - Greater KL - including a project to regenerate the old PJ town. The other project is the PJ Sentral Garden City.
     - contents and infra
     - business services
     - health care
     - tourism
     - education

b. The economic corridors are..
     - Sabah Economic corridor
     - Northern Economic Region
      - Iskandar.

   The other areas which may not attract much attention is the liberation of six sub- sectors. They are:

a. legal services
b. medical services
c. dental services
d. international school
e. private university
f. telecommunication.

What is not clear is the extend of liberation. Does it mean that a foreign companies have as much chance as a local company of local individual in offering the above services.

Saturday, October 27, 2012

Kota Kinabalu Airport - Runway Lights

The lights for the airport runway at Kota Kinabalu failed on Thursday 25 Oct 2012. This is the first time I hear about such a happening. It must be a record breaking event, probably worth the listing in the Guinness Record Book.
Until Saturday, the paper reported that the authority was not able to identify the fault. The Malaysia Air Force was asked to install  the temporary portable lighting. The job was reported completed by 930 pm on the second night.

I am curious, and wondering the last jobs done on the airport runway. So the search in the newspaper.. This is what the search revealed:

a. Then news on 17 July 2006, with the title.."Hill near KKIA levelled for runway extension". The paper reported that the job was done by .."State Local Government and Housing Minister Edward Yong Oui Fah said the company carrying out the runway extension, Global Upline Sdn Bhd".

b. The next logical search will be "The Global Upline Sdn Bhd"
There seem to be plenty of news about this company..
- the paper on Tuesday November 23, 2010 carried the title .."Airport extension delay worries Sabah"

A check on the website of Global Upline mentioned the following..(ref.http://www.globalupline.com/project4.html)
- ...Redevelopment of Kuching International Airport

Project on going
ClientGovernment of Malaysia (Ministry of transport)
Contract ValueRM 620,000,000.00
Date of Award2nd September 2004
Date of Completion1st March 2008
Project descriptionThe existing Kuching International Airport, located about 8km from Kuching City centre is being upgraded for unrestricted operation of boeing 747 aircraft. The major works involve in the redevelopment include extension of main terminal building as well as the existing runway and taxiway.
Other Main Features
Runway Length3,750m
Maximum Capacity46,000sq.m.
Number of Gates9 (6 Boeing 737 - 400 and 3 wide body aircrafts at any one time)
Remote Stand4 Fokker F50 (at any one time)




I seem odd that the project was stated as on going.

Friday, September 28, 2012

George Kent is Capable Said Najib

The Malaysian PM is coming out to defend the contractor George Kent. In the newspaper report, it was said that..." the company was able to meet the criteria stipulated in the contract and offered the second lowest out of 8 bidders". It seem odd to the majority of the people, how could the company get the contract. Consider this...
a. The contract awarded is RM1.08billion.
b. George main business .. water meter and water infrastructure.
c. Size of the company...2011 total sale rm165million.
d. About Balfour Beatty --- 2011 total sale USD3.5billion

From freemalaysia site... "Copies of official documents given to the press showed that Najib had signed the approval to award the contract to Balfour Beatty Invensys Consortium, but he was later said to be keen on granting the project to George Kent consortium instead."

I am sure that there is a criteria and selection guides designed in the selection process. The selected company will then sign the contract. It had never been done that the ability to meet the contract is used to select a company. What happen if all 8 are able to meet the contract. Would you trust a person who has never build a single rail track to take the project.

If you want to build a house, not many people will give the project to a contractor who says.. "I have never build a house before..."

Friday, August 31, 2012

George Kent Awarded The Ampang MRT

George Kent, a company specializing in making meters for water meters was awarded the contract to upgrade the Ampang LRT.
About George Kent..."George Kent is an engineering company involved in  manufacturing, trading and investment and development of  water infrastructure projects. The core business is in the water  industry. It has contributed to the nation’s manufacturing growth  by building up over the years to become the leader in the region  in brass products manufacturing. George Kent is the market  leader in the supply of control instrumentation, telemetry, pipes,  valves and fittings, industrial and domestic water meters, boilers,  incinerators and building automation systems..."  ... extracted from 2011 annual report..

The Star paper on 31 July published the news about the awards... KUALA LUMPUR: Syarikat Prasarana Negara Bhd has awarded the George Kent-Lion Pacific joint venture the contract to undertake the system works for the Ampang LRT line extension project.
Prasarana, which is the project and asset owner of the LRT line extension project, had on Tuesday said the contract would involve the engineering, procurement, construction, testing and commissioning. "The JV is 100% locally-owned companies and is well supported by reputable local and international multi-disciplinary technical partners; all with proven track records in their respective field of systems implementation expertise," it said.

The general public are screeching the heads wondering the basis of the tender award. The government is saying that they company will be working with established and experience international organisations to implement the project. The will draw upon the experiences of these organisations.

I wonder what strategies these people in power are thinking about..

But then the results show.. we are well behind Singapore in almost all fields.. That reflect the leadership we are having...

Thursday, August 23, 2012

Sarawak Aquatics Center Not Up to Standard

It was reported in the Star on Friday August 24, 2012 that Sarawak State's aquatics centre not up to Olympic standards. The report was made by  YU JI  (yuji@thestar.com.my)

So much for the euphoria and celebration to mark the opening of the RM36mil National Center of Excellence as part of the Youth Sport Complex. It was published as one of the best swimming and diving facilities in this country. Even the Federal Sport Minister was visiting the facilities to give support and get some free publicity.
The center was opened with much a fanfare, for the "great effort of the Federal Government to recognize the mould the local talents". What a anti-climax, they cannot even learn how to build a diving platform, a structure so basic that even an undergraduate would be able to design one, provided he is given the freedom to choose.

It is not UNCOMMON to find building build by Malaysia Federal Government, cracking and cannot be used. The most recent was, the ceiling of a public hospital felled off and injured the hospital workers...see

thestar.com.my/news/story.asp?file=/2012/8/13/nation/...sec...
Aug 13, 2012 ... SERDANG: Three nurses and a female medical officer at the Serdang Hospitals' Emergency Department were injured when 15 ceiling pieces ...

Another well known case was the MRR2 pillars that cracked. 31 out of the 33 pillars needed repair costing million. Although it was clear that it was not caused by nature, the peoples money was used to repair. The inconvenience and traffic delays was causing million MR, but there was no explanation by the contractors, and not even an apology.

Back to the issue in Sarawak.. it seem that they are asking for more of the Federal Funds... remind me of the speech by our PM..." I screeched your back and your screech my back....how much Lu want??"

Wednesday, August 22, 2012

Tanjung Bin TNB Plants

Malakoff, the biggest IPP (independent power producer) with the net generating capacity of 5020MW was given the contract to construct another 1000MW coal power station at Tanjung Bin in Johor. The contract was quoted priced at RM6.5bil (Starbiz page 6 14 Aug 20120).

Currently, Malakoff operates six Power Generation Plants in Malaysia. They are:
1. Tanjung Bin at Johor - coal fired - 2,100MW
2. Port Dickson            - Gas Turbine - 440MW
3. Kapar in Selangor    - Coal, Oil and Gas
4. GB 3 Perak                                     - 640MW
5. Lumut Perak             - Gas Turbine  - 1303MW
6. PERAI                      - Gas Turbine  - 350MW

The project is scheduled to complete on 2016. Under the secret agreement with the government, Malakoff will be making the generating capability for Tenaga National for 25 years. It is unknown whether the purchase rate is lower or higher than the market value.